Tuesday 27 September 2011

PILOT STUDY ON WATER USE EFFICIENCY FOR UPPER GANGA CANAL (UTTAR PRADESH)




Text Box: FINAL REPORT
PILOT STUDY ON WATER USE EFFICIENCY FOR
UPPER GANGA CANAL (UTTAR PRADESH)

CONTENTS

PAGE NO
1.0
Introduction
1
1.1
Approach
2
1.2
Water Use Efficiency
3
1.3
Conclusion & Recommendation
4
CHAPTER - 1 : INTRODUCTION
1.1
Origin of the System
1
1.2
Historical Background
1
1.3
Madhya Ganga Project
3
1.4
Upper Ganga Canal System
4
1.5
New Okhla Barrage
5
1.6
Allocation of waters
6
1.6.1
Criteria for Distribution of supplies
6
1.6.2
Procedure for Distribution of water
6
1.6.3
Share of various canal divisions during Kharif
7
1.6.4
Share of various  divisions during Rabi
8
1.7
Project Parameters
8
1.7.1
Landmarks
8
1.7.2
Modernisation of UGC System
9
1.7.3
Command areas
9
1.7.4
Salient control points & crossings
9
1.7.5
Alignment of UGC
9
1.8
Geomorphology
10
CHAPTER - 2 : SCOPE OF THE STUDY
2.1
Terms of Reference
1
2.2
Approach and Methodology
2
2.2.1
Study of the Releases
2
2.2.2
Components of various losses
2
2.2.3
Delta Analysis
3
2.2.4
Equity in Distribution
3
2.2.5
Avoidable Loss
3
2.3
Data Availability
4
2.4
Project Site Visits
5
CHAPTER - 3 :    BASE-LINE PARAMETERS OF UGC & THEIR EFFECT ON WATER-USE EFFICIENCY
3.1
Water Use Efficiency
1
3.1.1
Crop Water Requirement
1
3.1.2
Watering or Frequency of Irrigation
4
3.2
Water Allowance and Capacity Factor
10
3.3
Plan of releases into conveyance system
12
3.4
Study of water allowance
15
3.5
Outmoded irrigation & inequity oriented outlets
19
3.6
Dynamic Regulation
20
3.6.1
Suggested Approach for Modernising Communication System
22
3.7
Outlets on the UGC System - Evolution & Practices
23
3.7.1.1
Roster
29
3.7.1.2
Adjustment in allocation and Rosters
29
3.7.1.3
Regulation of Supplies on WJC / UGC
29
3.7.1.4
Supply at Tail ends of  UGC
30
3.8
Field Observations
30
3.9
Typical Allotment of Releases
32
3.10
Share Calculations
32
3.11
Canal Telegraph & Communication Network
33
3.11.1
Base Stations & Proposed Connected Field Stations
36
3.12
Control Structures on UGC
40
CHAPTER - 4 : ANALYTICAL STUDY OF THE LOSSES

4.1
Introduction
1
4.2
Field Efficiency
2
4.3
Seepage Loss
3
4.4
Assumed Losses
4
4.4.1
Losses on  UGC main line upper
8
4.4.2
Losses between Mat Branch M-33 & Utilised D/S
10
4.4.3
Losses on Mat Branch
10
4.4.4
Field Application Losses
16
4.4.5
Losses in the field
18
4.5
Recommendations for Improving WUE
20
4.6
Recommended Methods for Field Application
24
4.7
Increasing WUE

29
CHAPTER - 5 : CONCLUSIONS

5.1
General
1
5.2
Abstract of Loss & Water Use Efficiency
2
5.3
Factors affecting Water Use Efficiency
3
5.4
Inequity in Distribution & Unauthorised Practices
6
5.5
Financial Repercussion of Measures to improve the Water Use Efficiency
7
CHAPTER - 6 : RECOMMENDATIONS


Ø       ANNEXURES
Ø                 DRAWINGS
Ø       PHOTOGRAPHS




LIST OF ANNEXURES

CHAPTER - 1 : INTRODUCTION

Planning of Tentative Allocations for Rabi (UGC)
Daily Water Account for Releases
Tentative Roster for Rabi
Tentative Allotment for Kharif
Planning of Tentative Allocations for Kharif (UGC)

CHAPTER - 3 : BASE-LINE PARAMETERS OF UGC & THEIR EFFECT ON WATER-USE EFFICIENCY

Normal Monthly Effective Rainfall
Soil Moisture Storage
Critical periods of soil water stress
Zonewise Rainfall
Discharge Calculation at Site-Mahavan Distributary

CHAPTER - 4 : ANALYTICAL STUDY OF THE LOSSES

Comparative Statement of  Losses
Water Account & Irrigation - Jewer Distributary
Discharge table - Control point at Belara (UGC)
Discharge table - Control point at Niwari (UGC)
Discharge table - Control Point at Dhanauri (UGC)
Earlier Studies & Observations
Duty in Rabi Season (Earlier Studies)
Escape on UGC System
Chachura Down Kharif 1407 Crop Gauge & Discharge
4.9
Discharge Data - UGC System Circle I
Proposed Cropping Pattern
4.11
Roster schedule of various canals
4.12
Proposed Schedule of Jewer Distributary
Field Application Efficiency (%)
Weighted Average ET0 values




LIST OF DRAWINGS

CHAPTER - 1 : INTRODUCTION
1.1
Index Map - Districts in UGC Command
1.2
Index Map of Upper Ganga Irrigation Modernisation project
1.3
Line Diagram of Ganga Canal - Meerut Division
1.4
Line Diagram of Ganga Canal - Muzaffar Nagar Division
1.5
Line Diagram of Ganga Canal - Aligarh Division
1.6

Line Diagram of Ganga Canal - Mathura Division
CHAPTER - 3 : BASE-LINE PARAMETERS OF WJC & THEIR EFFECT ON WATER USE EFFICIENCY
3.1

Communication Network System - Upper Ganga Canal
CHAPTER - 4 : ANALYTICAL STUDY OF THE LOSSES
4.1
Longitudinal section of Awairni Minor
4.2
Longitudinal section of  Jewer Distributary
4.3
Longitudinal Section of Upper Mat Branch Canal



LIST OF PHOTOGRAPHS

FIG. NO
DESCRIPTION
1.
Mat Tail Reach
2.
Mahavan Distributary
3.
Jewer Distributary - D/s of Jewer - Aligarh Road
4.
Baldeo Distributary
5.
Head Regulator of Jatari Mr offtaking from Jewer Distributary
6.
Jewer Distributary at Bridge site at RD 44 Km
7.
Baldeo Distributary
8.
Mat Branch at RD 133.26 km
9.
H.R. of Mahavan Distributary





No comments:

Post a Comment